Learn about the commercial and industrial solar photovoltaic (PV) system activity to be undertaken by accredited persons under the Victorian Energy Upgrades (VEU) program.
Commercial and industrial solar photovoltaic system activity
Overview
Commercial and industrial solar photovoltaic system activity (activity 47) eligibility
The commercial and industrial solar photovoltaic system activity (C&I solar activity) under the VEU program involves installing of a solar photovoltaic (PV) system (consisting of inverters and PV modules) that has a solar PV module capacity of more than or equal to 30 kW and less than or equal to 200 kW that:
- is connected to a distribution network to produce and deliver energy
- is installed in compliance with the relevant Distribution Network Service Provider’s negotiated connection contract (DNSP contract)
- is either a new connection or a connection alteration
- uses solar PV modules (solar panels) listed on the Clean Energy Council (CEC) approved modules list
- uses inverters listed on the CEC approved inverters list.
The activity also needs to comply with additional product requirements, pre-installation requirements and installation requirements listed in the Part 47 of the VEU Specifications.
To be eligible, the activity must:
- be undertaken at a non-residential premises or site that is grid-connected.
- not be undertaken at:- a building that is classified as a Class 2 building (i.e. multi-unit residential buildings, e.g. apartment building).
- at a 'scheduled activity premises' as defined in Regulation 4 of the VEET Regulations, unless it has been 'opted in' to the program as described in Regulation 28.
 
Find out about eligibility and activity requirements for creating Victorian energy efficiency certificates (VEECs) under the C&I solar activity.
See the activity resources tab on this page for a detailed activity guide for the program requirements for creating Victorian energy efficiency certificates (VEECs), together with VEEC assignment form template which sets out the information which must be captured in the VEEC assignment forms for C&I solar activity
Get involved
If you are interested in undertaking C&I solar activities, you can either:
- work with an accredited person who is accredited to undertake C&I solar activities
- apply for accreditation or variation of accreditation conditions to undertake C&I solar activities
See the How to become an Accredited Person page for more information on applying for accreditation or variation of accreditation conditions to undertake C&I solar activities.
List of accredited persons approved to undertake C&I solar activities
Below is a list of accredited persons who have been approved to create for Victorian energy efficiency certificates (VEECs) for C&I solar activities:
| Business name | Accreditation number | Phone | Website | 
|---|---|---|---|
| Northmore Gordon Environmental | A000666 | 1300 878 500 | www.northmoregordon.com | 
| Shell Energy Engineering Pty Ltd | A001251 | 0417588161 | www.shellenergy.com.au | 
| EC Focus | A001452 | 03 8488 9994 | www.energyconservation.com.au |